Thursday, August 18, 2005

Since we weren't allowed by the original architect to run air-conditioning pipes and ducts on the outside of the building, we had to break into one of the 2nd floor offices and run the pipes into the hallway, then up and down the inside of the building. Not the ideal solution, but the only feasible one at this point.

Posted by Bart

0 Comments:

Post a Comment

<< Home