This is the upstairs mezzanine area. Here too the drop ceilings are going in, and much of the floor is going down. I think the last big piece will be the installation of the air-conditioning/heating units on the roof of the library (and the roof of the penthouse).
Posted by Bart
0 Comments:
Post a Comment
<< Home